Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for mining industry professionals · Thursday, April 18, 2024 · 704,579,387 Articles · 3+ Million Readers

Barkerville Gold Mines: Infill Drilling Confirms High-grade Gold Mineralization

BGM Intersects 12.54 g/t Au Over 18.20 Meters on Island Mountain

TORONTO, May 08, 2018 (GLOBE NEWSWIRE) -- Barkerville Gold Mines Ltd. (TSXV:BGM) (the “Company” or “Barkerville”) is pleased to announce additional drilling results from the 50,000-meter 2018 Island Mountain exploration and delineation program at the Company’s flagship Cariboo Gold Project.   Detailed drilling results, a drill hole location plan map and vertical sections are presented at the end of this release. The infill drilling results continue to demonstrate continuity and expansion of modelled vein corridors.

Historic Underground Workings and Modelled Vein Zones
Historic Underground Workings and Modelled Vein Zones


Island Mountain Drilling
Island Mountain Drilling


Island Mountain Drilling Section
Island Mountain Drilling Section


Drilling Highlights

  • IM-18-023: 42.20 g/t over 2.00 meters
  • IM-18-023: 54.51 g/t over 1.75 meters
  • IM-18-023: 73.8 g/t over 1.25 meters
  • IM-18-033: 16.96 g/t over 9.30 meters
  • IM-18-038: 12.54 g/t over 18.2 meters
  • IM-18-038: 17.91 g/t over 5.65 meters
  • IM-18-039: 22.87 g/t over 5.85 meters
  • IM-18-041: 36.41 g/t over 4.30 meters
  • IM-18-046: 27.41 g/t over 4.35 meters

Vein Zone Continuity on Island Mountain

The intervals noted above were intersected in holes designed to infill and expand known vein corridors on the property down to depths of 500 meters. The program consisted of 50,000 meters drilled in 162 holes, mainly in the Shaft Zone area. Mineralized quartz veins on the Cariboo Gold Project are hosted within the sandstones and are an anastomosing network of high vein density with an overall sub-vertical dip and northeast strike.  Recent modelling of the vein corridors Island Mountain proposes 101 mineralized vein corridors. These vein corridors have estimated horizontal width of 3 meters and a strike length of up to 300 meters. These corridors have been defined from surface to a vertical depth of 600 meters and remain open for expansion at depth and down plunge. Gold grades are intimately associated with vein-hosted pyrite as well as pyritic, intensely silicified wall rock haloes in close proximity to the veins.

Qualified Persons

Exploration activities at the Cariboo Gold Project are administered on site by the Company’s Project Geologists, Kyle Orr and Felipe Castaneda. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged.  The remaining drill core is subsequently stored on site at the Company’s secure facility in Wells, BC.  Numbered security tags are applied to lab shipments for chain of custody requirements.  The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s Qualified Person, Maggie Layman, P.Geo, Vice President Exploration.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

For further information on Barkerville Gold Mines Ltd. please contact:

Chris Lodder
President & Chief Executive Officer
155 University Avenue, Suite 1440
Toronto, Ontario, Canada
clodder@barkervillegold.com

About Barkerville Gold Mines Ltd.

The Company is focused on developing its extensive mineral rights package located in the historical Cariboo Mining District of central British Columbia. Barkerville’s Cariboo Gold Project mineral tenures cover 1,950 square kilometres; along a strike length of 67 kilometres which includes several past producing placer and hard rock mines, making it one of the most well-endowed land packages in British Columbia. Since the management change in mid-2015, the Company has unlocked the fundamental structural controls of gold mineralization. The Company’s Brownfield’s exploration team is focused on developing and delineating a mineable resource within the 7 kilometers of principle project area located near the town of Wells, British Columbia.  The Company’s Greenfield’s team is developing quality exploration assets throughout the remaining land package through systematic, scientific, exploration.  The operation’s team is focused on developing and mining the Bonanza Ledge and BC Vein deposits on Barkerville Mountain.  This operation allows the company to generate near term cash flow, train a local work force, keeps the present mining permit active, and de-risk’s the project through staged production growth.  Processing of material from these deposits is processed at the QR mill.  QR is a fully owned, permitted mill and tailings facility, located approximately 110 kilometres away from Wells, and can be accessed by an all-season road.

Cautionary Statement on Forward -Looking Information
Neither the TSX Venture Exchange (‘TSXV’) nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Table 1: Length weighted gold composites from Island Mountain
HOLE ID   FROM TO CORE LENGTH (M) AU (G/T)
IM-18-023   79.75 80.30 0.55 15.35
    221.70 222.60 0.90 8.49
    230.50 231.00 0.50 5.63
    265.35 266.20 0.85 5.26
    281.50 282.15 0.65 15.00
    316.00 318.00 2.00 42.20
  INCLUDING 317.00 318.00 1.00 58.00
    352.75 354.50 1.75 54.51
  INCLUDING 353.25 354.50 1.25 73.80
    366.90 368.25 1.35 4.81
    384.75 385.25 0.50 5.12
    513.00 514.50 1.50 5.74
    517.00 518.50 1.50 7.83
IM-18-023_1   354.00 354.80 0.80 20.20
    368.95 370.50 1.55 4.65
    394.70 395.30 0.60 10.10
IM-18-024 ABANDONED        
IM-18-025   51.35 51.95 0.60 16.40
    63.40 63.90 0.50 15.60
    85.00 86.00 1.00 11.30
    90.85 91.35 0.50 22.40
    96.35 99.55 3.20 9.57
  INCLUDING 97.15 98.65 1.50 13.05
    112.80 114.30 1.50 61.40
    194.20 194.90 0.70 5.24
    240.15 240.65 0.50 4.92
IM-18-026   51.95 54.70 2.75 31.83
  INCLUDING 53.40 54.10 0.70 51.20
  AND 54.10 54.70 0.60 61.00
    97.75 99.50 1.75 7.54
  INCLUDING 97.75 99.00 1.25 9.43
    134.00 136.75 2.75 9.44
  INCLUDING 134.00 134.85 0.85 16.65
  INCLUDING 134.85 135.40 0.55 15.25
    153.65 154.15 0.50 10.45
    214.20 214.75 0.55 68.90
IM-18-027   83.15 85.00 1.85 13.41
  INCLUDING 83.15 83.65 0.50 18.80
  AND 83.65 84.30 0.65 21.10
    171.55 172.80 1.25 11.50
  INCLUDING 172.25 172.80 0.55 19.40
    171.55 172.80 1.25 11.50
  INCLUDING 172.25 172.80 0.55 19.40
    174.45 179.15 4.70 12.82
  INCLUDING 174.95 175.55 0.60 18.35
  AND 177.65 178.40 0.75 25.50
  AND 178.40 179.15 0.75 15.50
    181.60 185.35 3.75 5.21
  INCLUDING 181.60 182.20 0.60 11.50
  AND 184.30 184.85 0.55 13.15
  AND 184.85 185.35 0.50 7.72
    361.50 362.85 1.35 53.24
    396.15 396.65 0.50 25.00
    397.15 397.65 0.50 5.27
    401.00 401.55 0.55 82.30
    402.60 403.10 0.50 6.44
    408.05 408.60 0.55 8.70
IM-18-028   163.30 164.20 0.90 7.03
IM-18-029   81.10 82.50 1.40 17.10
IM-18-030   28.50 29.40 0.90 15.40
    33.70 34.25 0.55 16.90
    152.00 152.60 0.60 5.87
    225.80 226.30 0.50 4.76
    303.00 303.75 0.75 5.66
    305.80 306.30 0.50 17.40
    344.35 345.10 0.75 9.66
    350.30 350.80 0.50 6.11
    389.50 390.70 1.20 15.01
  INCLUDING 390.10 390.70 0.60 22.70
IM-18-031   34.00 34.90 0.90 5.68
    83.15 83.70 0.55 30.10
    88.15 90.00 1.85 17.81
  INCLUDING 89.10 90.00 0.90 28.90
IM-18-032   66.00 66.50 0.50 9.13
    87.80 88.30 0.50 4.62
    112.50 113.25 0.75 47.20
IM-18-033   31.15 31.80 0.65 4.14
    32.75 33.25 0.50 4.51
    143.20 145.20 2.00 5.79
    145.90 146.40 0.50 4.16
    148.20 148.85 0.65 5.19
    163.50 165.00 1.50 3.22
    210.60 212.50 1.90 17.36
  INCLUDING 210.60 211.25 0.65 29.50
  AND 211.75 212.50 0.75 18.40
    216.50 217.50 1.00 19.15
  INCLUDING 217.00 217.50 0.50 26.90
    266.85 267.35 0.50 13.05
    337.00 338.15 1.15 15.25
    428.75 430.95 2.20 12.71
  INCLUDING 428.75 429.25 0.50 24.20
    473.30 482.60 9.30 16.96
  INCLUDING 473.30 474.00 0.70 16.05
  AND 474.00 474.50 0.50 53.60
  AND 476.00 476.65 0.65 57.90
  AND 476.65 477.35 0.70 21.50
  AND 479.50 480.00 0.50 18.15
  AND 480.00 481.25 1.25 29.30
  AND 482.00 482.60 0.60 14.65
    492.50 493.00 0.50 5.08
    497.00 497.50 0.50 5.67
IM-18-034   11.00 11.65 0.65 23.40
    21.15 22.00 0.85 12.50
    84.00 84.55 0.55 36.50
    121.80 122.55 0.75 6.82
    135.90 136.65 0.75 6.02
    161.00 162.50 1.50 7.09
  INCLUDING 162.00 162.50 0.50 9.60
    165.50 166.30 0.80 8.99
    242.65 243.30 0.65 11.90
    244.20 245.50 1.30 21.39
IM-18-035   89.00 89.50 0.50 4.59
    100.65 102.00 1.35 11.00
    115.35 116.50 1.15 4.57
IM-18-036   125.60 126.10 0.50 9.45
    220.15 220.80 0.65 16.80
    297.80 299.00 1.20 3.77
    327.50 328.85 1.35 11.57
  INCLUDING 327.50 328.15 0.65 15.25
    344.50 347.50 3.00 14.25
    344.50 345.00 0.50 56.20
    347.00 347.50 0.50 26.00
    355.55 356.20 0.65 22.30
    398.60 399.50 0.90 17.90
    407.35 407.95 0.60 15.40
    409.15 409.70 0.55 4.11
    412.75 413.40 0.65 8.01
    414.15 414.65 0.50 16.75
IM-18-037 ABANDONED    
IM-18-038   61.90 64.10 2.20 34.04
  INCLUDING 62.50 63.00 0.50 55.20
    66.00 70.60 4.60 20.34
  INCLUDING 67.00 68.30 1.30 30.20
    77.80 78.70 0.90 13.00
    81.80 100.00 18.20 12.54
  INCLUDING 81.80 82.60 0.80 26.20
  AND 84.20 85.00 0.80 34.60
  AND 85.00 86.50 1.50 25.90
  AND 91.00 92.50 1.50 15.80
  AND 92.50 93.00 0.50 16.30
  AND 96.00 97.00 1.00 13.75
    102.00 103.00 1.00 11.15
    104.00 104.60 0.60 5.90
    116.05 117.80 1.75 15.96
  INCLUDING 116.05 116.55 0.50 22.50
    171.40 172.50 1.10 46.21
  INCLUDING 171.40 172.00 0.60 80.60
    218.70 219.20 0.50 11.60
    223.75 224.25 0.50 91.90
    226.30 239.00 12.70 4.22
  INCLUDING 227.80 228.30 0.50 6.17
  AND 229.55 230.30 0.75 29.00
  AND 233.50 234.00 0.50 6.68
  AND 237.35 238.00 0.65 8.28
  AND 238.50 239.00 0.50 10.40
    244.00 249.65 5.65 17.91
  INCLUDING 244.00 245.00 1.00 10.70
  AND 248.35 249.65 1.30 67.00
IM-18-039   50.50 51.30 0.80 31.50
    54.85 60.70 5.85 22.87
  INCLUDING 54.85 56.10 1.25 44.60
  AND 59.00 60.00 1.00 61.50
  AND 60.00 60.70 0.70 11.00
    104.60 105.35 0.75 5.52
    112.80 113.30 0.50 12.15
    116.50 117.00 0.50 19.20
    120.00 120.50 0.50 4.81
    148.80 151.00 2.20 12.69
  INCLUDING 149.50 151.00 1.50 16.65
    192.40 193.30 0.90 4.52
    222.15 222.80 0.65 5.00
    244.70 247.65 2.95 7.53
  INCLUDING 247.15 247.65 0.50 15.50
    251.00 252.00 1.00 10.25
    282.70 284.30 1.60 7.65
  INCLUDING 283.60 284.30 0.70 10.05
IM-18-040   165.30 166.00 0.70 10.50
    176.15 181.00 4.85 7.17
  INCLUDING 176.15 176.80 0.65 4.58
  AND 178.80 179.30 0.50 31.70
  AND 180.50 181.00 0.50 9.02
    305.00 305.75 0.75 19.30
IM-18-041   25.90 30.20 4.30 36.41
  INCLUDING 25.90 26.50 0.60 31.00
  AND 27.00 27.80 0.80 114.00
  AND 27.80 28.45 0.65 40.90
  AND 28.45 29.00 0.55 20.10
    126.35 129.00 2.65 6.96
  INCLUDING 126.35 127.00 0.65 16.15
    159.25 160.75 1.50 19.20
    165.50 166.00 0.50 16.20
    217.50 218.20 0.70 4.09
IM-18-042   61.50 63.00 1.50 5.01
    190.00 191.50 1.50 5.39
IM-18-043   23.50 24.00 0.50 14.70
    24.60 25.15 0.55 5.65
    188.50 189.00 0.50 40.20
    193.40 194.15 0.75 17.65
    197.95 198.50 0.55 6.66
IM-18-044   18.75 19.60 0.85 16.95
    24.00 26.40 2.40 20.19
  INCLUDING 24.00 25.25 1.25 27.40
  AND 25.90 26.40 0.50 28.40
    127.35 128.00 0.65 4.46
    155.50 157.00 1.50 20.20
    315.50 316.90 1.40 14.65
    349.50 351.00 1.50 9.11
    350.50 351.00 0.50 17.65
IM-18-045   65.25 66.00 0.75 6.44
    227.65 228.55 0.90 48.60
    270.95 271.55 0.60 7.71
    273.35 273.85 0.50 11.90
    278.35 279.00 0.65 32.30
    284.20 284.70 0.50 9.08
    305.50 306.00 0.50 13.70
    322.60 323.45 0.85 7.53
    368.00 372.00 4.00 5.22
  INCLUDING 368.00 369.00 1.00 12.40
  AND 371.00 372.00 1.00 6.86
IM-18-046   282.50 283.00 0.50 5.35
    353.00 354.00 1.00 10.10
    447.90 456.15 8.25 14.36
  INCLUDING 447.90 449.00 1.10 11.05
  AND 452.00 452.65 0.65 45.30
  AND 453.85 455.00 1.15 13.25
    460.75 461.70 0.95 10.40
    474.00 475.00 1.00 11.10
    496.00 500.35 4.35 27.41
  INCLUDING 496.00 497.00 1.00 19.75
  AND 497.50 498.75 1.25 51.10
  AND 498.75 499.75 1.00 30.90
    520.30 520.80 0.50 13.75
    523.65 524.55 0.90 8.73
    536.70 537.70 1.00 19.40
IM-18-047   138.80 139.75 0.95 9.49
    213.15 213.65 0.50 5.34
    267.30 268.05 0.75 12.90
    269.10 269.65 0.55 12.60
    408.60 409.70 1.10 10.30
    421.50 428.50 7.00 11.68
  INCLUDING 421.50 422.25 0.75 12.70
  AND 422.80 423.60 0.80 29.80
  AND 426.40 427.10 0.70 12.50
  AND 427.85 428.50 0.65 47.40

True widths are estimated to be 50 to 75% of reported core length intervals. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays.

Table 2: Drillhole Collar Orientations:
HOLE ID AZIMUTH DIP
IM-18-023 123 -65
IM-18-024 124 -64
IM-18-025 151 -50
IM-18-026 149 -60
IM-18-027 130 -58
IM-18-028 131 -53
IM-18-029 146 -60
IM-18-030 135 -44
IM-18-031 145 -59
IM-18-032 134 -45
IM-18-033 120 -65
IM-18-034 143 -57
IM-18-035 139 -58
IM-18-036 134 -54
IM-18-037 122 -65
IM-18-038 108 -44
IM-18-039 114 -53
IM-18-040 141 -51
IM-18-041 133 -50
IM-18-042 146 -44
IM-18-043 133 -47
IM-18-044 130 -63
IM-18-045 142 -45
IM-18-046 123 -67
IM-18-047 125 -55

Photos accompanying this announcement are available at

http://resource.globenewswire.com/Resource/Download/3af6cda1-f406-45df-8a9c-ee378d87ae84

http://resource.globenewswire.com/Resource/Download/6067136f-f7cf-479b-903b-2fcff490b1ea

http://resource.globenewswire.com/Resource/Download/f450833c-0f36-4dd5-86d6-b0047919d9ae

Primary Logo

Powered by EIN News
Distribution channels: Mining Industry


EIN Presswire does not exercise editorial control over third-party content provided, uploaded, published, or distributed by users of EIN Presswire. We are a distributor, not a publisher, of 3rd party content. Such content may contain the views, opinions, statements, offers, and other material of the respective users, suppliers, participants, or authors.

Submit your press release